If the total project fee is $1,000,000 with engineering 30% and architectural 70%, what are the respective dollar amounts?

Prepare for the NCARB Project Management Exam. Use multiple choice questions, hints, and detailed explanations. Gain confidence and excel in your exam!

Multiple Choice

If the total project fee is $1,000,000 with engineering 30% and architectural 70%, what are the respective dollar amounts?

Explanation:
Allocating a total project fee by given percentage splits. To find each amount, multiply the total fee by the share for that discipline. Engineering has 30% of the project fee, so 1,000,000 × 0.30 = 300,000. Architectural has 70%, so 1,000,000 × 0.70 = 700,000. The two amounts add up to the total, confirming the distribution and reflecting that engineering receives the smaller portion. The other options would swap or use percentages not consistent with 30% and 70%.

Allocating a total project fee by given percentage splits. To find each amount, multiply the total fee by the share for that discipline. Engineering has 30% of the project fee, so 1,000,000 × 0.30 = 300,000. Architectural has 70%, so 1,000,000 × 0.70 = 700,000. The two amounts add up to the total, confirming the distribution and reflecting that engineering receives the smaller portion. The other options would swap or use percentages not consistent with 30% and 70%.